Below are some images of our airtight, passive construction methodology undertaken at a Ros Cheide renovation in Wolfe Tone Street, Sligo.

 

IMG-1870

 

We achieved extremely good U-Values on the walls with Xtratherm rigid insulation behind the airtight membrane combined with the green Rockwoll within the electrical services cavity. We used rigid insulation between the joists and thermal liner (insulated plasterboard) on the ceiling.

 

IMG-1868

 

Due to this fabric first approach and with the triple glazed windows that will go in, the building will have an extremely low heating requirement. By using timber frame partitions instead of blockwork, the building’s structural materials sequester C02 rather than creating additional greenhouse gases.